The courtyard of the residential blocks 2, 2A, 2B, 2E, and 2G from Stejarilor Street as a length of 300 meters and a surface area of 1,042.6 sq.m. Workers will install 300 meters of curbs on both sides of the road, and 150 meters of small curbs. The authorities will use 228 tons of gravel and will lay 122.5 tons of asphalt on 1 042.6 sq m with a thickness of 5 centimeters. Also, about 30 sq.m. of concrete will be used.
Mayor of Orhei, Ilan Shor, said today during a site isit that the City Hall is making every effort to finalize as soon as possible the modernization of the 60 courts from the “Operation Courtyard” program. He assured that all projects started at Orhei will be completed and new projects will be launched.
” For me this project is quite important. I said and say. The court is the family of the tenants where people feel the first emotions and feelings and I want Orhei inhabitants to enjoy the modernization of the yards they live in. I have noticed that the city's inhabitants enjoy this project, therefore, as an elected deputy, I will continue the social projects that I have started”, declared the Mayor of Orhei, Ilan Shor.
We remind that more than 40 courtyards of multi-level blocks in Orhei, out of the 60 planned under the “Operation Courtyard” project, have already been rehabilitated and modernized. The project was launched last spring, at the initiative of Orhei City Hall, in order to modernize the infrastructure and the spaces around the multi-leveled blocks in the town of Orhei. Thus, the yards are fully repaired and equipped with parking slots, specially designed places for drying clothes, playgrounds for children.