According to a provision of Mayor of Orhei, Ilan Şor, the Municipal Enterprise "Locative Communal Services" carries out extensive works for the modernization and repair of roads on 5 streets of the town of Orhei with a total length of over 1000 meters.
Thus, starting with July 01st, there are works at an alert pace on five arteries concurrently, and namely: Junimii, Maxim Gorki, Sportivilor, Alexandru cel Bun and the road Maxim Gorki, arteries that interact with the main street Vasile Lupu and are located in the adjacent area Orhei Lake.
We mention that these streets are in deplorable condition and have not been repaired decades in a row.
Repair works include propelling and excavation of surfaces, as well as gravel coverage. Subsequently, workers will cover roads with a layer of up to 10 cm of bituminous asphalt.
At the same time, besides the modernization of the road, the curbs and asphalt cover of the access roads to the courtyards are changed.
Upon rehabilitation and modernization of roads, the highest quality materials are used, over 2000 meters of curb and about 2000 tons of asphalt.
About 20 professional workers and technical units are trained to carry out the work within the set deadline.
Also, at the indication of Ilan Shor, it will soon be procured its own asphalt and pavement plant, which will reduce costs, create new jobs, but will also allow the city to pave the roads with its own production.
Thus, Orhei becomes the only city in the country that not only modernizes and implements major infrastructure projects, but also uses its own human, technical and financial resources.
According to the action plan promoted by the Mayor of Orhei in 2017, the works of modernization and rehabilitation of the roads will continue on the streets of Vasile Mahu, Gheorghe Asachi, Ciprian Porumbescu, Chisinau, Renasterii Nationale, Doina and Ion Aldea Teodorovici, Parfionov and the street that leads to the Jewish Cemetery (the cemetery will also be landscaped), as well as the streets of Constantin Brancusi, Dimo Street and the road to Ivanos Park.
At the same time, the main artery of Orhei, Vasile Lupu Street, will enter into the major repair and modernization.
We remind that in the last two years, with the arrival of Ilan Shor, as the mayor of Orhei, about 30 kilometers of road and six kilometers of sidewalks were rebuilt, and in some parts of the city where the streets were practically non-existent, they were paved for the first time.
The modernization and rehabilitation of the roads in Orhei municipality is a basic priority for Mayor Ilan Shor and his team, which objectives were presented on March 01st by the "For Orhei" faction in front of the town's inhabitants. The development of Orhei's infrastructure and raising the standards of living are also found in the electoral program presented by the Mayor Ilan Shor in 2015, which he has successfully implemented so far.